Click to download all lines we
are now representing through Archer
Lighting Solutions
Hosemaster Manufaturing
Plant Retrfit
Hose Master Manufacturing has built its 25 year reputation manufacturing the highest quality corrugated hose. So when they retrofitted the existing lighting system in their 250,000 square foot facility they demanded the same standard of excellence they provide to their customers. By selecting Westinghouse Lighting Solutions they saved 50% on their lighting bills but also bought a product whosequality is second to none in the lighting industry. Hose Master has seen a substantial increase in light levels while enjoying continued savings.
Fort Knox Base
Daylighting
United States Army Recruiting Command building retrofit to include utilize daylighting. Click here to learn more about Bristolite Daylighting Systems and see project examples.
United States Army Recruiting
Office Building Retrofit
This project saved approximately $86,000 for the U.S. Army annually. Will Equipment Company partnered up with Schneider Electric to complete this project.
Tractor Supply
Retail Retrofit
Tractor Supply
Annual Energy Savings: $6,735
Payback: 15 month
Benefits:
• Substantial increase in
light levels
• High quality uniform light
distribution & color rendering
• Reduced Carbon Footprint
• Uplight eliminated cave effect
• Cutoff blade louver provided
superior glare control